CLIENT |
PROJECT |
DESCRIPTION |
DATE |
|
BIPROMET S.A. in Katowice
|
The industrial 5-bays hall 55m high in KGHM Polska Miedź S.A. Unit in Głogów |
Building Engineering and Detail Engineering civil/structure documentation of the hall for two furnaces
|
2011 |
|
ZGH „Bolesław” S.A. in Bukowno |
Build of the New Zinc Hall in ZGH “Bolesław” S.A. in Bukowno |
Complex documentation – Building Permit Design and Detail Engineering
|
2011 |
|
ArcelorMittal Warszawa Sp. z o.o, in Warszawa
|
The installation SBQ in the New Rolling-mill |
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
|
ArcelorMittal PoladnS.A. Oddział |
Adjusting existing reduction-mixing station SRM 34 for the needs of supplying walking furnace with mixing gas
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
|
ArcelorMittal Poland S.A. Oddział in Kraków |
Chemical Cleaning Water Plant no 1 – extension of – enlargement of production capability water demineralization station. Replacing of soft chemical water with demineralization water
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
|
ArcelorMittal Poland S.A. Kraków Uunit |
Biological Treatment Water Plant no 1
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
|
ArcelorMittal Poland S.A. Kraków Uunit |
Industrial Waste Water Treatment for Coke Plant for ArcelorMittal Poland S.A. Branch in Kraków
|
Complex documentation – Building Permit Design and Detail Engineering |
2010 |
|
Celsa Huta Ostrowiec Sp. .z o.o. in Ostrowiec Świętokrzyski |
New Water Treatment Plant for two Continuous Casting Lines In Electric Steel Plant with reconstruction existing auxiliary facilities and demolition part o existing facilities
|
Complex documentation – Building Permit Design and Detail Engineering |
2009 |
|
Celsa Huta Ostrowiec Sp. .z o.o. in Ostrowiec Świętokrzyski |
Reconstruction existing water economy of Continous Casting Line In Electric Steel Plant with reconstruction existing auxiliary facilities and demolition part o existing facilities
|
Complex documentation – Building Permit Design and Detail Engineering |
2009 |
|
Biuro Projektów „Koksoprojekt” |
„Erection of cleaning coke gas from hydrosulphur, ammonia with ecologic and economic prove their utilization” in Koksownia Victoria S.A. in Wałbrzych
|
Detail Engineering in civil branch |
2009 |
|
Zakłady Koksownicze „Zdzieszowice” |
Modernization of loading system of coke in sorting plant no 3
|
Complex documentation – Building Permit Design and Detail Engineering |
2009 |
|
Celsa Huta Ostrowiec Sp. .z o.o. |
New Continous Casting Line no 1 |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
|
Celsa Huta Ostrowiec Sp. .z o.o. |
Extension of COS no 1 |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
|
CMC Zawiercie S.A. |
Extension of Rod Mill |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
|
Zakłady Koksownicze „Zdzieszowice” |
Installation of rail scales for weighing in motion
|
Complex documentation – Building Permit Design and Detail Engineering |
2008 |
|
CMC Zawiercie S.A. |
New Rod Mill – MORGAN |
Complex documentation – Building Permit Design and Detail Engineering
|
2008 |
|
Huta Batory Sp. z o.o. in Chorzów |
Steel Plant – Reconstruction of electric furnace |
General Management – Reconstruction of electric furnace Q=30 Mg with installation next to furnace and damaged elements of steel constructions and foundations
|
2007 /2008 |
|
Celsa Huta Ostrowiec Sp. .z o.o. |
Execution of new buildings for new Rolling Mill no 2 |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
|
CMC Zawiercie S.A. |
Build-on new store buildings of products ready to dispatch |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
|
ISD Huta Częstochowa sp. z o.o.
|
Thick Plate Mill – cooling ttype “MULPIC” |
Complex documentation – Building Permit Design and Detail Engineering |
2007 |
|
Celsa Huta Ostrowiec Sp. .z o.o. |
Build – on existing Mill |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
|
Stalprodukt S.A. |
MgO coating lines technology for transformers stripsTransformer Plate Mill
|
Technical documentation of installation of lines B3; B4; C3” in the bay K-L
|
2007 |
|
Celsa Huta Ostrowiec Sp. .z o.o. |
Revamping of existing Rods and Shapes Mill |
Complex documentation – Building Permit Design and Detail Engineering
|
2007 |
|
ARCELOR S.A. |
Rolling Mill
|
Multidiscipline Building Permit Design |
2006 |
|
CELSA – STEEL PLANT OSTROWIEC |
- Walking-beam cooler receiving ingots 160x160x15 500
|
Technical analysis of walking beam work and instructions concerning construction changes of cooler
|
2006 |
|
CELSA – STEEL PLANT OSTROWIEC |
- Electric arc furnace no 6; Q = 140 Mg |
- Building Permit Design for electric arc furnace - Strength analysis of hall structure of electric steelworks in order to mantle new exhausting hood and new exhausting ducts for electric arc furnace Q=140 Mg - Technical documentation of reinforcement electric arc furnace hall - Foundations under exhausting systems of furnace - Expansion of exhausting system (new dust silo) - Technical documentation of control room and electrical building of dedusting system - Technical documentation of transformer building 115 MVA electric arc furnace - Relocation of electric networks
|
2005 |
|
CMC ZAWIERCIE SA |
Electric arc furnace – Continuous Casting Line - Installation of self-cleaning HYDAC filter for CCM 1 and 2 water systems. - Waste water systems for the new requirements of CMC Zawiercie EAF + CCM department
|
Complex multidiscipline design works
|
2004 |
|
CMC ZAWIERCIE SA |
-Electric arc furnaces + Continuous Casting Machine dept.
|
- Technical modernization of two tundishes for Steel Continuous Casting Line - Strength analysis and technical documentation of reinforcement tundish roadbeds
|
2004 |
|
DANIELI & C.SPA ITALY UNICOIL SAUDI ARABIAN |
Cold Rolling Mill - quick work-roll change car - quick work-roll change tractor - rolling mill drive - main drive spindle
|
Detail Engineering of equipment
|
2004 |
|
CMC ZAWIERCIE SA |
Materials/products flow organization
|
Analyze of possibilities with technical conception
|
2004 |
|
ISPAT POLSKA |
- Overhaul of substation P50d/0,4 kV - Blow distributing station for BF 5. - Steel structure for electrolytic degreasing tank in ZB dept. - Regulation system for chemically clean water pump group in ZE dept. - Installation of hydrokinetic couple
|
Detail Engineering |
2003 |
|
DANIELI & C.SPA WŁOCHY KSC – IRAN |
- Parallel shear for continuous cutting strip edges. - Quick shear exchange
|
Detail Engineering of equipment |
2004 |
|
ALUTECH KĘTY |
- Modernization of Anodizing Plant in Kęty |
Multidiscipline complex building and detail engineering (Land Development Conditions - WZ, Environmental Impact - OŚ, Building Detail Design, Detail Engineering)
|
2003 |
|
HPH KATOWICE |
- Equipment for continuous line manufacturing alu-wire dia. 10 mm.
|
Detail Engineering of equipment |
2003 |
|
ZW – SHAPE MILL in ZAWIERCIE
|
- Modernization of water system in Shape Mill
|
Multidiscipline Detail Engineering |
2003 |
|
STEEL PLANT ŁAZISKA SA |
Modernization of furnace hall no III |
Alternative conception of modernization furnace hall no III (2 electric furnaces each powered 20 MVA for casting FeSi) with cost summaries
|
2003 |
|
DANIELI & C.SPA ITALY SAAB - SWEDEN
|
- Shear for cutting strip edges. - Cut-off pusher
|
Detail Engineering of equipment
|
2003 |
|
DELPHI POAND |
Canister laboratory and fuel storage |
Complex multidiscipline documentation
|
2003 |
|
DANIELI & C.SPA ITALY SHAOUGANG - CHINA
|
- Roller shear for cutting edges - Cut-off pusher - Strip clumping rolls
|
Detail Engineering of equipment |
2003 |
|
DANIELI & C.SPA ITALY
VIETNAM |
CONTINUOUS PICKLING LINE - straightener - pulling rolls - coil turning machine - cut-offs retraction - feeding table - carry-away table side guides
|
Detail Engineering of equipment
|
2003 |
|
DANIELI & C.SPA ITALY TRAMETAL –- ITALY
|
Hot rolling Mill - rolling mill spindle set - feeding rolls drive - cylinders for strip side-pushing guides - rolling mill spindle supports
|
Detail Engineering of equipment |
2002 |
|
STEEL PLANT ZAWIERCIE S.A. |
- Fume dedusting system for Converter Plant - Installation of billet grinding machine Diameter measuring stand for hot rolled rods
|
Multidiscipline complex building and detail engineering (Land Development Conditions - WZ, Environmental Impact - OŚ, Building Detail Design, Detail Engineering)
|
2001 |
|
DANIELI & C.SPA ITALY BREMEN -GERMANY |
- Flying shear - Quick shear exchange Pulling rolls
|
Detail Engineering of equipment |
2002 |
|
DANIELI & C.SPA ITALY MARTE |
Coil receiving line - Coil car - Coil drawer - Coil opener - Coil turner - Turn-round platform - Coil saddle with rollers - share - walking beam transporter verical coil transporter
|
Detail Engineering of equipment
|
2001 |
|
STEEL PLANT LUCCHINI - WARSZAWA |
Installation of Vacuum Degasser VD 80 t - Cooling water technology, nitrogen, argon and steam installations. High and low voltage feeding systems - Instrumentation and computer control - Water system equipment
|
Multidiscipline documentation of power engineering installations
|
2000/ 2001 |
|
STELL PLANT ZAWIERCIE S.A. |
Wire Rolling Mill |
Complex multidiscipline Building Permit and Detail Engineering (with installations) of installation new automatic technological line for wire production
|
1999/ 2000 |
|
DANIELI & C.SPA ITALY CORNIGLIANO –– ITALY
|
- coil car - coil turner
|
Detail engineering of equipment |
1999 |
|
HPH SA KATOWICE |
Dip Galvanising Plant - Foundations and steel and reinforced steel concrete constructions - Multi-branch engineering for Dip Galvanizing lines with auxiliary facilities and shops - Installation of dip galvanizing process line, - External/internal utility networks, sewage, HVAC systems, - Telecommunication systems, - High/low voltage supplying networks - External roads, squares and parking with lighting
|
Building Design – Building Permit As-built documentation
|
1999 |
|
DANIELI & C.SPA ITALY IPSCO-2 –KOREA
|
- Quick shear exchange -Static shear exchange
|
Detail Engineering |
1998 |
|
DANIELI & C.SPA ITALY MARCEGAGLIA – ITALY |
COLD ROLLING MILL - Coil car - Car with drive - Hydraulic installation - instalacja hydrauliczna - lubrication - anchoring bolts calculations - emulsion cooling
|
Detail Engineering
|
1998 |
|
STEEL PLANT |
Converter Steel Plant - Overhaul of track no 774 w Steel Plant area, - Overhaul of fire-fighting road no 252 with the possibility of access on working level +8,15 m in Steel Plant - Revamping the administration building no 720
|
Detail Engineering |
1996 |
|
STEEL PLANT |
Powerplant - Installation of PE-270-150-3 pump replacing pump Epz no 3. - Reconstruction of BF blowing pipeline from turbo-blower No 4.
|
Detail Engineering |
1996 |
|
STELL PLANT |
Sintering plant no 2 - Overhaul of sintering blowers no 2 i 4 - Flame checking systems on sintering belts no DL-1 up to DL-4
|
Complex multidiscipline documentation
|
1991 |
|
STEEL PLANT |
Blast Furnaces - Installations and control systems of BF equipment, - Master Plan, roads, yards, macro/micro- leveling for coal-dust injection to BF 3 and BF 5,
|
Complex multidiscipline documentation
|
1995 |
|
STEEL PLANT |
Hot Strip Rolling Mill - Revamping HSM 1700 - Relocation of Æ 700 pipeline in water tunnel, feeding the new strip laminar cooling system, cooling systems for working rolls and delay roller tables, oil cooling systems in hydraulic rooms. - Installation of new delay roller table, new strip laminar cooling and inter-stand equipment, - General reconstruction of finishing roller group together wit feeding and utility - Including the existing hydraulic system of vertical roller weighing of stand no 5A up to 10 to the new hydraulic system, - Delay roller area - Delay roller area between stand no 4 and shear 45x1550 - Side guides electric drive on roller table before shear 45x1550 - Modernization of share 45x1550 drive feeding.
|
Complex multidiscipline documentation
|
1995 |
|
STEEL PLANT |
Steel Plant Continuous Casting Electric installations of CC Machine - CC Machine electric equipment adaptation - Air compressor station no 4 - modernization - Installations and control system of water and HVAC system for CCM, - Technologic start-up in scope of programmable controller and microcomputers for auxiliary facility of CCM
|
Complex multidiscipline documentation
|
1994 |
|
AIR LIQUIDE |
Oxygen Plant – Oxygen bloc no 5 – - modernization of electroenegetic networks - feeding the oxygen bloc - Modernization of utility systems with oxygen, nitrogen networks for the requirements of new technologies,
|
Complex multidiscipline documentation
|
1995 |
|
STEEL PLANT
|
Pig iron desulphuring Plant - Mixer hall - Pig iron desulphuring
|
Complex multidiscipline documentation
|
1995 |
|
STEEL PLANT CZĘSTOCHOWA |
Electric Steel Plant - Main building of Electric Steel Plant - Electric furnace hall - Fan Cooler for electric converter
|
- Building Design and Detail Engineering |
1995 |
|
STEEL PLANT ZAWIERCIE S.A. |
Steel Continuous Casting Line - Installation of Casting Machine no 2 - Installations of instrumentation and control for the complex of pumping and oxygen rooms for installations of CCM1 and CCM2 - |
Complex multidiscipline documentation
|
1992
|
|
STEEL PLANT OSTROWIEC S.A. |
Steel Continuous Casting Line - Installation of Casting Machine - Water management - modernization - Compressor Room
|
Complex multidiscipline documentation
|
1996 |
|
STEEL PLANT ŁABĘDY – ELSTAL |
Steel Continuous Casting Line - Installation of Continuous Casting Machine with power engineering management and tundish
|
Complex multidiscipline documentation
|
1995 |
|
INDUSTRY AND TRADE MINISTRY |
Elaboration recommended by European Union concerning Restructuring Polish Steel Industry. Participation in Polish Working Team in „Global Study on Steel”.
|
Defining of possibilities of regional cooperation in European steel industry
|
1995 |
|
AIR LIQUIDE |
Erection of Oxygen Plant in Steel Plant Huta Katowice S.A.
|
Complex multidiscipline documentation |
1994 |